Kallos Homes

Plan with confidence

A renovation budget that makes quotes comparable

Build a useful renovation budget for a home in Greece by separating scope, allowances, exclusions and changes instead of guessing a price per square metre.

Overhead renovation budgeting desk with three neatly separated plain quotation sheets, calculator, tape measure, wood swatch and pencil on pale oak; no readable writing
AI-generated editorial illustration created for this guide. Not a photograph of an actual property or completed project.

Two quotations can describe the same apartment and cover very different work. A single price per square metre hides decisions about services, joinery, finishes and access. A useful budget starts with a shared scope and shows what is known, what is estimated and what is excluded.

At a glance: A useful budget separates defined work, provisional selections and unresolved risks. Compare what is included before comparing totals, and record the effect of every approved change.

Build the budget around work packages

Create separate lines for surveys and design, approvals, protection and demolition, building repairs, electrical and plumbing work, surfaces, joinery, fittings and handover. Add delivery, removal and any temporary accommodation you actually need. Ask whether taxes and installation are included. This is a comparison structure, not a claim about current Greek market prices.

Make allowances visible

If tiles or appliances are not selected, ask for an explicit supply allowance and the quantity it covers. Clarify whether wastage, trims, adhesives and fitting are separate. A low provisional allowance can make a quote look attractive while leaving a predictable extra cost later. Compare like-for-like specifications, not just final totals.

Keep uncertainty separate from upgrades

Discuss a contingency for conditions that cannot be confirmed until investigation or opening-up. Its size should reflect the property and survey findings, rather than a universal percentage. Keep discretionary upgrades in a separate list. Spending the reserve on a decorative upgrade removes protection against genuine unknowns.

Agree how changes are priced

Before work starts, agree a written variation process: description, price, schedule impact and approval. Use a simple running total of contract value, approved changes and remaining allowances. For example, relocating a sink may affect cabinetry, drainage and finishes; the tap price alone does not describe the change.

Build a budget with separate columns

Use a simple spreadsheet with work package, description, quantity assumption, supply, installation, exclusions and status. Put known prices in one column and provisional allowances in another. Keep the source and date of each quotation. This makes it easier to update one decision without losing track of the rest of the project.

For example, separate the price of a bathroom fitting from delivery, installation and any associated work. Do not count an allowance as both a separate purchase and part of the contractor's total. Ask whether quoted figures use the same treatment of taxes and other charges. Clarify the applicable amounts directly with the supplier or your adviser rather than assuming that every document is presented in the same way.

Use an illustrative change calculation

Suppose an agreed work package is represented by 100 budget units. A different finish adds 8 units to material supply, 3 to installation and 2 to delivery. The change is 13 units before considering any confirmed omission or other effect. These are invented units to explain the method, not market prices or a suggested contingency percentage.

Now consider timing. If the alternative arrives later, ask whether other tasks can continue or whether there is a separate programme impact. Record the revised total, the approved specification and any agreed effect on completion together. A message saying 'the material costs a little more' is not a complete variation because it describes only one part of the change.

Keep uncertainty visible instead of hiding it

List unresolved conditions separately: the state of a concealed substrate, an installation that has not been inspected or a product still awaiting selection. Ask what investigation would reduce each uncertainty and when that investigation can occur. A survey may be a better early use of money than ordering an optional finish before the technical scope is known.

Keep a record of amounts committed, amounts paid and costs still to be confirmed. These are different views of the same budget. A project can appear comfortable in terms of cash already paid while substantial orders are committed. Review the complete position before approving optional upgrades, and agree payment arrangements through appropriate written documents.

Decide where a reduction will actually help

If the total exceeds your available budget, review scope before asking every supplier for an arbitrary discount. An optional built-in unit may be deferred without disturbing the rest of the work; reducing essential preparation can create a very different risk. Ask the responsible professionals to explain what can be phased, simplified or retained.

Compare alternatives by their effect on the finished home and on later work. Keeping a sound floor might avoid removal and threshold changes, while selecting a less expensive cabinet finish might retain the useful internal layout. The aim is to protect the decisions that solve your main problems. Record every agreed omission so that a lower revised price is not mistaken for the original full scope.

Three amounts that should not be confused

AmountMeaningTrack alongside it
QuotedA supplier's price for a described scopeValidity, exclusions and assumptions
CommittedWork or products you have authorisedApproved changes and delivery status
PaidMoney already transferredRemaining obligations and relevant records

Frequently asked questions

Can I estimate everything using price per square metre?

A headline rate can be a rough conversation starter, but it does not describe condition, scope, product choices or access. Use a project-specific breakdown before making a purchasing or contractual decision.

Should the budget include furniture?

Include it if it is part of what you need to make the home usable, but show it separately from construction. Also identify delivery and installation responsibilities so that the same item is neither omitted nor counted twice.

Your practical checklist

  • Request itemised inclusions and exclusions.
  • List undecided products and their allowances.
  • Confirm tax, delivery and installation treatment.
  • Approve changes in writing before they proceed.
Visual summary of the four checklist points above.
An original Kallos Homes reference card for this guide.

Continue with a related practical guide →

One coordinated team

Design, trades & finishing

English & Greek

A clear conversation

Based in Athens

Kallithea, Greece

ROOTED IN ATHENS

Your next chapter. Let’s start here.

A conversation about your home, in the heart of Kallithea. Call us to arrange a time to discuss your ideas.

Andromachis 215, Kallithea, Athens 176 73, Greece

KALLOS HOMES · ATHENS

Find us in Kallithea.

Load the interactive Google map for this visit. Google receives connection information when you load it.

ATHENS / KALLITHEAOpen in Google Maps