Plan with confidence
Renovation permissions in Greece: questions to ask
Prepare a useful conversation with your engineer about drawings, approvals, shared building elements and the documents needed for your renovation.

The word renovation covers very different projects. Repainting a room is not the same proposal as changing a facade, relocating services or altering a wall. This guide helps you prepare for an engineer’s assessment; it does not determine which permission your property requires.
At a glance: Describe the proposed work precisely and ask a qualified local engineer which approvals and documents apply to this property. The word renovation alone does not determine the procedure.
Describe the work precisely
Bring a room-by-room list, photographs, available approved drawings and information about previous alterations. Mark proposed changes to walls, openings, balconies, external equipment and shared services. Ask the engineer to identify what must be investigated before the proposal can be classified. Avoid relying on a contractor’s verbal assurance that every internal change is automatically exempt.
Separate public approvals from building agreements
Ask which public approvals, professional studies or notifications apply, and who will obtain them. Separately, check arrangements for common parts, access, roof use and building-management communication. Agreement from a neighbour does not answer a planning question, and a planning document does not settle every private building arrangement. Get property-specific advice for both.
Ask who owns each next step
Gov.gr identifies e-Adeies as the route through which engineers issue and manage administrative acts for construction work. Ask your appointed engineer which procedure applies to the confirmed scope, what information is missing and when work can lawfully start. Record the responsible person, deliverable and expected dependency in your project plan.
Keep the final record
Ask for copies of the relevant approvals, final drawings and any documents that must be updated when the work changes. Keep these with warranties and service records. If the scope expands during construction, pause to ask whether the approval route must also change. Recheck current requirements with the engineer rather than treating an online checklist as legal permission.
Prepare the information an engineer needs
Bring the available property documents, plans and a clear list of proposed changes. Mark what you intend to remove, add, move or replace. Include changes to services, openings, external appearance and shared elements even if they seem minor. A photograph of the room is useful context, but it is not a substitute for the building information needed to assess the work.
Explain the current condition separately from the desired design. If previous alterations are visible or recorded, identify them without assuming that they were authorised. The professional can tell you which records need checking. Avoid commissioning a detailed final scheme around an assumption that a particular wall, opening or external installation can be changed.
Ask for the conclusion in a usable form
Request a written explanation of the procedure the professional considers applicable, the information still missing and who is responsible for obtaining it. Clarify the boundaries of the assessment: a statement about one operation should not be read as approval for every part of a larger project. Keep the final scope and the relevant drawings together.
This guide deliberately does not label specific works as universally exempt or give a blanket permit rule. Requirements depend on the work and property, and the applicable framework can change. Use official Greek services and the responsible engineer for the current procedure. Building management discussions and a contractor's quotation do not replace that assessment.
Manage changes after the first assessment
If the scope changes, return to the professional before instructing the new work. A proposal that starts as a finish replacement may develop into a different intervention once the design progresses. Keep a simple change record showing the original decision, the proposed alteration and the response received.
Store final documents in an organised property folder with dates and versions. Make sure that the people carrying out the work have the relevant current drawings rather than an earlier concept. At handover, ask which records should be retained for future maintenance or property administration. Good record keeping does not establish compliance by itself, but it prevents important information from being lost.
Frequently asked questions
Can the contractor decide that no approval is needed?
Ask the appropriately qualified professional responsible for assessing the proposed works to confirm the procedure for your property. A casual statement or an online list is not enough to settle a project-specific question.
Does this article tell me which permit to apply for?
No. It helps you prepare a useful brief and ask precise questions. It does not replace the current official process, a property-specific engineering assessment or legal advice where needed.
Your practical checklist
- Collect available approved plans and alteration records.
- Describe external and shared-element changes explicitly.
- Confirm responsibilities before a start date.
- Keep approvals and final drawings in one project folder.